INVENTOR ENGINEERS

Design Drawing DPR for Structure, Water, Sewerage and Road

RCC Bridge

Location: Dhosa, Government of West Bengal (GoWB)
Client: Government of West Bengal

Project Description:
The RRC Bridge project in Dhosa, West Bengal, involved the design and construction of a critical bridge to improve connectivity and transportation across the region. The project included structural, infrastructural, and road network development to ensure efficient movement of traffic and promote regional development. The bridge was designed to withstand heavy loads and adverse weather conditions while ensuring long-term durability and safety.

Scope of Work:

  1. Structural Design:
    • Design of Bridge Structure: Developed detailed structural designs for the bridge, including foundations, superstructure, and supporting elements, to ensure safety and longevity.
    • Load Analysis & Reinforcement: Performed extensive load-bearing analysis and designed the bridge to accommodate high traffic volumes, with necessary reinforcements for durability.
    • Seismic Design: Incorporated seismic considerations in the structural design to ensure the bridge’s resilience against potential earthquakes.
  2. Infrastructural Design:
    • Drainage and Water Management: Designed an efficient drainage system around the bridge to prevent water logging and ensure smooth flow during heavy rains.
    • Utility Integration: Integrated utility lines and services (e.g., electrical and water systems) into the bridge and surrounding infrastructure as needed.
    • Safety Features: Implemented guardrails, signage, and lighting systems to ensure safe navigation for vehicles and pedestrians.
  3. Road Network Design:
    • Approach Roads: Designed and developed the road network leading to the bridge, ensuring proper alignment, smooth traffic flow, and minimal disruption to local transportation.
    • Pavement Design: Engineered the pavement for both the bridge and its approach roads, ensuring durability and resilience against wear and traffic stress.
    • Traffic Management: Provided recommendations for traffic management and flow optimization around the bridge area.
  4. Environmental Considerations:
    • Designed the project to have minimal environmental impact, with consideration for local ecology and water bodies near the bridge site.
    • Implemented erosion control and habitat preservation measures in line with environmental regulations.